Permit Summary

Permit No.
PTW-2026-0148
Applicant
Ahmad Hakim
Dept./Company
Seri Maju Engineering
Location
Tanjung Bidara Platform - Pump Deck
Zone/Class
Zone 2 / General
Equipment/Tools
Hand tools, portable lighting
Required
13/05/2026, 08:00-17:00
Work Description
Inspection and non-sparking maintenance on auxiliary pump housing.

Review Sections

CER
Certificates
Electrical isolation and gas test certificates selected.
Check
PRE
Precautions
Gas test, fire watch, fire extinguisher, toolbox meeting, warning signs, and barricade selected.
Ready
PPE
PPE
Eye/face, hand, and head protection required.
Ready
END
Endorsements
Operations and HSE endorsement rows prepared.
Check
VAL
Validity
Permit valid for the requested date/time only.
Timed
COM
Completion
Close-out signature pending after work completion.
Check

PTW Procedure Flow

1
Applicant completes permit detailsAction
2
Applicant, receiving authority, work leader, and approving authority discuss controlsAction
3
Approving authority records required precautionsAction
4
Need for other certificates?Decision
5
Certificates and gas tests completed when applicableAction
6
Joint site inspection recordedAction
7
Receiving authority and work leader confirmAction
8
Approving authority signs before work startsAction
9
Work stopped while incomplete?Decision
10
Revalidation, gas test recheck, or shift handoverAction
11
Is work complete?Decision
12
Receiving authority signs off and returns permitAction

Permit Controls

GAS
Gas Test Certificate
Frequency: every 2 hours; authorized gas tester required before work starts.
ISO
Electrical Isolation Certificate
Closed-valve isolation and lockout/tagout must be confirmed.
PPE
PPE and Precautions
Eye/face, hand, head protection; warning signs and barricade selected.

Review Notes

Back